Nov 2008 T2 Hardware

Things that can happen whenever:

  • configure PDUs power strips
  • install power cords to PDUs
  • label needed network cables
  • get hostnames registered (figure out IPs to use)
  • add nodes to ROCKS
  • make labels for nodes, pdus, racks

Nov 11 Expand Switch Stack

On this Tuesday, we'll put the 3 new switches into the main stack. One switch will replace unit 1 and the other 2 will be located in rack 106 to expand the stack from 5 to 7 units.

Things that need to be ready to do this:

  • switches, check firmware version, need config
  • rack 106
  • cx4 stacking cables. need to check existing and see which will be replaced
  • modules, need to check which will need to be modified

Nov 18 Install New Computers

On this Tuesday, hopefully we can rack and install the computers.

-- TomRockwell - 06 Nov 2008

This topic: AGLT2 > WebHome > MSUToDo
Topic revision: 16 Oct 2009, TomRockwell
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback